TIMBER SQUARE

Contractor: Mace

痴补濒耻别:听拢6.6尘

Core drilling Builders work Holes
Breaking out Temporary road surface
Breaking out localised existing Slabs
Concrete Encasement
Structural Concrete Repair
Cosmetic Concrete Repair
80% of the former Print building’s original structure was retained.
115 tonnes of reused steel saved 276 tonnes of CO2 (equal to 47 trips around the world!).
Hybrid CLT frame reduced embodied carbon by 75%, saving 6,250 tonnes of CO2