SOUTH BANK TOWER

Contractor: Mace聽 聽 聽 聽 聽 聽 聽 聽Architect: KPF

痴补濒耻别:听拢14尘聽 聽 聽 聽 聽 聽 聽 聽 聽 聽 聽 聽 Engineer: AKT

  • Temporary works design development
  • Installation of temporary works and high level crash decks
  • Progressive demolition
  • Install temporary works to support the 11th floor structure
  • Demolish and infill works, to areas affecting the new construction
  • De-construct west stair core progressively down to basement
  • New construction of core progressively up from basement to 10th floor
  • Remaining demolition and infill works