MILLENIUM BRIDGE HOUSE Contractor: ISG聽 聽 聽 聽 聽 聽Architect: Piercy & Company 痴补濒耻别:听拢18尘聽 聽 聽 聽 聽 聽 聽 聽 聽 聽 聽 聽 Engineer: HTS Reconfiguration of facades to all elevations Temporary works and propping Scaffolding package Cladding removal 9000m2 Demolition of 5500m3 of reinforced concrete MOLA attendance Basement reconfiguration adjacent the Thames Pile caps 330 tonnes of structural steel 6,000 m3 of new structrual concrete connected to the existing structure