HS2 – OLD OAK COMMON (RETAINING WALL)

Client: BBVS (Balfour Beatty, Vinci, Systra)
Value: 拢7尘

  • SSE Substation Retaining wall section -Install pile mat, piles, ground聽 聽 聽 聽 聽 聽 聽 聽 聽 聽 聽anchors and construct RC bases and walls.
  • Station Access Retaining wall -Install pile mat, piles (panels 1, 2 & 3)聽 聽 聽 聽 聽 聽 聽 聽 聽 聽 聽 聽construct RC bases and walls (panels 1 & 2).
  • Crossrail Depot Retaining wall -Install pile mat, piles, ground anchors and聽 聽 聽 聽 聽 聽construct RC bases and walls.
  • SSE Substation Relocation Civils works.
  • Utilities Protection Zone works
  • Installing Type 1 layered ramp from within the site compound at the newly聽 聽 聽 聽 聽 constructed west box to the top of Old Oak Common Lane.
  • Liaising with local authority and stats providers for interface with existing聽 聽 聽 聽 聽 聽highway and live services.
  • Undertaking ecological surveys.
  • Critical HS2 milestone dates linked to completion of UTPz works.