EPAC HARWELL CAMPUS Contractor: Mace聽 聽 聽 聽 聽 聽 聽 聽Architect: Fairhursts Design Group 痴补濒耻别:听拢7尘聽 聽 聽 聽 聽 聽 聽 聽 聽 聽 聽 聽 聽 聽Engineer: Glanville Site enabling works Clearance of remaining vegetation, kerbs, car park hard standings and聽 聽 聽 聽 聽 聽 聽 聽 聽 聽redundant fencing Cut and fill exercise to achieve levels across the site, and reduced levels for聽 聽 聽 聽 聽the floor slab formation Installation of the concrete slab for site cabins Foul and Storm drainage, including floor drains and gullies, manholes,聽 聽 聽 聽 聽 聽 聽 聽 聽 聽attenuation tanks Connecting to existing foul and surface drains from RFI enabling works Below ground level pits, bases, culverts and thickenings Formation of a vertical labyrinth beneath the ground floor slab Supply and lay insulation under the ground floor slab Super structure RC walls, up to 2.5m thick and up to 11m in height Upper slabs/upper RC floors Hard Landscaping and Tarmac