BILLITER STREET Contractor: Mace聽 聽 聽 聽 聽 聽 聽 聽Architect: Make 痴补濒耻别:听拢4.2尘聽 聽 聽 聽 聽 聽 聽 聽 聽 聽 聽 聽 Engineer: WSP Soft strip and lift removal while retaining the listed items within the Grade聽 聽 聽 聽 聽 2 listed building Notifiable and non-notifiable asbestos removal Design and installation of a CAT 2 fa莽ade retaining temporary works聽 聽 聽 聽 聽 聽 聽 聽 聽 聽 聽 聽system including the manual of installation of 70t of steelwork Demolition of the existing roof, the South and East facades and floorplates聽 聽 聽 聽 聽between Level 4 to聽 Ground Floor Installation of underpinning, lift pits and capping beams ahead of the聽 聽 聽 聽 聽 聽 聽 聽 聽 聽rebuild of the permanent structure Formation of a twin RC lift shaft from Basement to Level 4 using the Peri聽 聽 聽 聽 聽 聽 DUO System Formwork Installation of a new steel frame to the South and East fa莽ades from聽 聽 聽 聽 聽 聽 聽 聽 聽 聽 basement to Level 5 Installation of timber bays and composite slabs to the new steel frame Timber installation to strengthen the existing structure throughout Drainage installation throughout the Basement Brickwork repairs and the installation of the Helifix repair system聽 聽 聽 聽 聽 聽 聽 聽 聽 聽 聽 聽 聽 throughout the building Formation of builderswork openings through structural walls across the聽 聽 聽 聽 聽 聽 聽 basement Structural waterproof tanking to the basement slab and walls Installation of RC upstands to riser openings Installation of GRP riser flooring from Ground Floor to Level 4