81 NEWGATE STREET

Contractor: Mace聽 聽 聽 聽 聽 聽 聽 听础谤肠丑颈迟别肠迟: KPF

痴补濒耻别:听拢50m聽 聽 聽 聽 聽 聽 聽 聽 聽 聽 聽 聽 Engineer: AKT II

  • Full Strip Out of the existing BT Centre Building.
  • Removal of existing Roof Structure.
  • Structural Demolition to Blocks A, B, C , Ground floor & Basement.聽 聽 聽 聽 聽 聽 聽 聽 聽 聽 聽 聽 聽Including Design & Installation of all temporary propping & cross聽 聽 聽 聽 聽 聽 聽 聽 聽 聽 聽 聽 聽 聽bracing.
  • Temporary Welfare Gantry
  • Tower crane bases
  • Construction of West Basement RC Box (including excavation works).
  • Construction of Cores 1, 2, 3 & 4, Twin wall & Insitu RC.
  • B2 to Ground Floor Construction to enable new steel frame to be聽 聽 聽 聽 聽 聽 聽 聽 聽 聽 聽 聽 聽 聽 聽constructed from GF.
  • 2 for 1 Column Replacement (including bridging steel between Blocks A&B)
  • Beam Strengthening & Column Jackets
  • NW Core steelwork infill from B2 to level 9
  • Drainage
  • Concrete Toppings to new steel frame & metal decking structure.
  • BMU plinths