81 NEWGATE STREET Contractor: Mace聽 聽 聽 聽 聽 聽 聽 听础谤肠丑颈迟别肠迟: KPF 痴补濒耻别:听拢50m聽 聽 聽 聽 聽 聽 聽 聽 聽 聽 聽 聽 Engineer: AKT II Full Strip Out of the existing BT Centre Building. Removal of existing Roof Structure. Structural Demolition to Blocks A, B, C , Ground floor & Basement.聽 聽 聽 聽 聽 聽 聽 聽 聽 聽 聽 聽 聽Including Design & Installation of all temporary propping & cross聽 聽 聽 聽 聽 聽 聽 聽 聽 聽 聽 聽 聽 聽bracing. Temporary Welfare Gantry Tower crane bases Construction of West Basement RC Box (including excavation works). Construction of Cores 1, 2, 3 & 4, Twin wall & Insitu RC. B2 to Ground Floor Construction to enable new steel frame to be聽 聽 聽 聽 聽 聽 聽 聽 聽 聽 聽 聽 聽 聽 聽constructed from GF. 2 for 1 Column Replacement (including bridging steel between Blocks A&B) Beam Strengthening & Column Jackets NW Core steelwork infill from B2 to level 9 Drainage Concrete Toppings to new steel frame & metal decking structure. BMU plinths