21 MOORFIELDS

Contractor: Sir Robert McAlpine聽 聽 聽 聽 聽 聽 聽 聽Architect: Wilkonson Eyre

痴补濒耻别:听拢8尘聽 聽 聽 聽 聽 聽 聽 聽 聽 聽 聽 聽 聽 聽 聽 聽 聽 聽 聽 聽 聽 聽 聽 聽 聽 聽 聽 聽Engineer: Robert Bird Group

  • Screeding
  • Insulation and waterproofing to existing retained deck
  • Reinforced concrete to retained deck
  • Pressure Grouting to Pile Heads
  • Floating floor slabs
  • Construction of new UKPN Substation and post scanning rooms
  • Insitu Concrete Stairs
  • Upstands
  • BMU Plinths and pads
  • Drainage and Cast-In Channels